Technip Energies has secured licensing and engineering contracts for Petkim’s proposed integrated petrochemical complex in Aliağa, Türkiye. The 29 September 2026 announcement marks a technical development step for the SOCAR subsidiary’s project.

The scope includes licensing for a mixed-feed ethylene cracking unit, an integrated process design package and front-end engineering design for the wider complex.

The planned steam cracker would produce approximately 1.2 million tonnes of ethylene and 550,000 tonnes of propylene annually. Associated facilities include an 850,000-tonne-per-year polyethylene complex and a 550,000-tonne-per-year polypropylene plant.

The contracts cover preparatory design and technology work ahead of any final investment decision by Petkim. They therefore advance project definition without confirming that construction has been sanctioned. The proposed complex would supply materials used in packaging, consumer products, automotive components and industrial applications.

OG